Tiger Rush Online Slot Logo

Tiger Rush Slot: Demo Play, Best Casinos, Review

Released Oct. 10, 2018
Slot Studio Thunderkick
RTP ranges! 96.3%
Volatility Medium
Theme Animals, Asian
Reels 5
Rows 3
Paylines 25
Bonus Game No
Free Spins No
Wild Yes
Scatter Yes
Multipliers No
Top Win x1,783
Bet Size 0.10-100 USD/EUR
Hit Freq. N/A
Win both ways Re-spin feature Expanding reels Expanding wilds

Tiger Rush Demo Mode

Tested Casinos To Play Tiger Rush Slot

Since: 2023 Cashouts: 0-30 minutes 300,000 $/day Wager: x50 No ID cashouts Mobile Live Dealers
Bitcoin
USDC
USDT
Ethereum
Solana
BNB
Tron
Litecoin
Dogecoin
TON
Polygon
Game Types: 14 Slot Providers: 43 Online Slots: 8,000+ Crash Games
Since: 2025 Cashouts: 0-15 minutes 50,000 $/month Wager: x80 No ID cashouts Mobile Live Dealers
Bitcoin
USDT
USDC
Ethereum
Solana
BNB
Ripple
BitcoinCash
Litecoin
Tron
Dogecoin
Polygon
Game Types: 13 Slot Providers: 42 Online Slots: 8,500+ Crash Games
Since: 2018 Cashouts: 0-30 minutes 2,000,000 $/month Wager: x45 No ID cashouts Live Dealers
Bitcoin
USDC
USDT
Ethereum
Solana
Ripple
BNB
BitcoinCash
Tron
Litecoin
Dogecoin
TON

+ 1 more

Game Types: 13 Slot Providers: 38 Online Slots: 5,500+ Crash Games

Tiger Rush Paytable

Tiger Rush - RTP Analyzer
Tiger Rush Online Slot Logo

RTP - 96.3%

Be aware! RTP of Tiger Rush ranges! It means that at some casinos the RTP might be significantly lower than declared 96.3%!
Tiger Rush: image of main menu
Tiger Rush - Volatility and Required Bankroll Analyzer
Medium Volatility
Provides good balance between the frequency of winnnings and their size. This volatility level can be risky during bad runs, but winnings also can be solid. Great choice for player who don't mind taking risks but don't want it to be too high.
Required Bankroll* (based on our experience)
Aggressive
100 bets
Normal
200 bets
Conservative
400 bets
*Number of bets we recommend for this slot depending on your play style
Comparison Of Tiger Rush Mobile Casinos
Accepted Players United States flag United States flag United States flag
Welcome Bonus 100% up to 3000$/€ 100% up to 10000$/€ 100% up to 400$/€
Wager x50 x80 x45
Cashback up to 15% up to 15% up to 20%
Deposit Methods Bitcoin, USDC, USDT, Ethereum, Solana, BNB

+ 5 more

Bitcoin, USDT, USDC, Ethereum, Solana, BNB

+ 6 more

Bitcoin, USDC, USDT, Ethereum, Solana, Ripple

+ 7 more

Cashout Speed 0-30 minutes 0-15 minutes 0-30 minutes
No ID Cashouts
Visit Website bitz.io crypto-games.io bspin.io
Tiger Rush: image of winning
Tiger Rush - Features Analyzer
Tiger Rush offers 7 out of 32 most popular online slot features
Autoplay
Bonus Game
Free Spins
Wild
Scatter
Multipliers
In-Game Jackpot
Progressive Jackpot
Buy Bonus
Megaways
Gamble Feature
Cascading Reels
Colossal Symbols
Adjustable Paylines
Pays Both Ways
Respin
Expanding Reels
Expanding Wilds
Expanding Symbols
Sticky Wilds
Random Wilds
Multiplier Wild
Walking Wilds
Multiplier Free Spins
Increasing Multipliers
Infinity Reels
Nudging Reels
Cluster Pays
Scatter Pays
Mystery Symbol
Hold Feature
Split Symbols
Tiger Rush In Comparison With Other Slots
Tiger Rush
Producer Thunderkick Pragmatic Pragmatic
RTP 96.3% 96.55% 96.42%
Volatility Medium High High
Max Win x1,783 x5,000 N/A
Released Year 2018 2025 2017
Paylines 25 0 1,024
Free Spins 10-20 8-25
Buy Free Spins x100-x500
Multipliers x2-50 x2-27
Wild Symbol
Scatter
Other Features

Autoplay, Win Both Ways, Respin, Expanding Reels, Expanding Wild

Autoplay, Cascading Reels, Free Spins Multipliers, Increasing Multipliers, Scatter Pays

Autoplay, Multiplier Wild

Comparison Table of All Thunderkick Slots (92)
# Slot Name RTP % Volatility Max Win Play For Free
1.  1429 Uncharted Seas 98.5 % Low x670 Demo Play
2.  Børk The Berzerker … 97.34 % Medium x2,100 Demo Play
3.  Toki Time 97.1 % Low x1,130 Demo Play
4.  Barber Shop Uncut 97.0 % Medium x2,355 Demo Play
5.  Fruit Warp 97.0 % Medium-high x11,000 Demo Play
6.  Beat the Beast: Dra… 96.44 % High x11,111 Demo Play
7.  The Wildos 96.44 % High x6,250 Demo Play
8.  Triple Royal Gold 96.41 % High x5,000 Demo Play
9.  Spectra 96.4 % Medium x2,400 Demo Play
10.  Sword Of Shoguns 96.4 % Extreme x25,200 Demo Play
11.  The Rift 96.3 % Low x815 Demo Play
12.  Tiger Rush 96.3 % Medium x1,783 Demo Play
13.  Sunset Delight 96.3 % Low x413 Demo Play
14.  Luchadora 96.2 % Medium x1,995 Demo Play
15.  Zoom 96.2 % Medium-low x1,500 Demo Play

This Page Was Last Updated: Feb. 3, 2026