Billyonaire Online Slot Logo

Billyonaire Slot: Demo Play, Best Casinos, Review

Released Dec. 4, 2017
Slot Studio Amatic
RTP ranges! 96.33%
Volatility Medium
Theme Luxury
Reels 5
Rows 4
Paylines 40
Bonus Game No
Free Spins Yes (7)
Wild Yes
Scatter Yes
Multipliers No
Top Win x1,000
Bet Size 1-100 USD/EUR
Hit Freq. N/A
Risk feature Adjustable paylines

Billyonaire Demo Mode

▶

Tested Casinos To Play Billyonaire Slot

Since: 2023 Cashouts: 0-30 minutes 300,000 $/day Wager: x50 No ID cashouts Mobile Live Dealers
Bitcoin
USDC
USDT
Ethereum
Solana
BNB
Tron
Litecoin
Dogecoin
TON
Polygon
Game Types: 14 Slot Providers: 43 Online Slots: 8,000+ Crash Games
Since: 2025 Cashouts: 0-15 minutes 50,000 $/month Wager: x80 No ID cashouts Mobile Live Dealers
Bitcoin
USDT
USDC
Ethereum
Solana
BNB
Ripple
BitcoinCash
Litecoin
Tron
Dogecoin
Polygon
Game Types: 13 Slot Providers: 42 Online Slots: 8,500+ Crash Games
Since: 2022 Cashouts: 0-3 days 30,000 $/month Wager: x40 Mobile Live Dealers
Bitcoin
Visa
Mastercard
Skrill
Neteller
Paysafecard
Muchbetter
Mifinity
Rapid
Interac
Ripple
Litecoin

+ 2 more

Game Types: 14 Slot Providers: 33 Online Slots: 4,500+ Crash Games
Since: 2022 Cashouts: 0-24 hours 100,000 $/month No ID cashouts Mobile Live Dealers
Bitcoin
USDT
USDC
Ethereum
Solana
BNB
Ripple
BitcoinCash
Litecoin
Tron
Dogecoin
ShibaInu

+ 1 more

Game Types: 14 Slot Providers: 71 Online Slots: 7,500+ Crash Games
Since: 2024 Cashouts: 0-48 hours no cashout limits No ID cashouts Mobile Live Dealers
Bitcoin
USDT
USDC
Ethereum
Solana
BNB
Ripple
BitcoinCash
Litecoin
Tron
Dogecoin
TON

+ 3 more

Game Types: 14 Slot Providers: 53 Online Slots: 7,000+ Crash Games

Billyonaire Paytable

Billyonaire - RTP Analyzer
Billyonaire Online Slot Logo

RTP - 96.33%

Be aware! RTP of Billyonaire ranges! It means that at some casinos the RTP might be significantly lower than declared 96.33%!
Billyonaire: image of main menu
Billyonaire - Volatility and Required Bankroll Analyzer
Medium Volatility
Provides good balance between the frequency of winnnings and their size. This volatility level can be risky during bad runs, but winnings also can be solid. Great choice for player who don't mind taking risks but don't want it to be too high.
Required Bankroll* (based on our experience)
Aggressive
≈
100 bets
Normal
≈
200 bets
Conservative
≈
400 bets
*Number of bets we recommend for this slot depending on your play style
Comparison Of Billyonaire Mobile Casinos
Accepted Players United States flag United States flag United States flag
Welcome Bonus 100% up to 3000$/€ 100% up to 10000$/€ 100% up to 1000$/€
Wager x50 x80 x40
Cashback up to 15% up to 15% up to 20%
Deposit Methods Bitcoin, USDC, USDT, Ethereum, Solana, BNB

+ 5 more

Bitcoin, USDT, USDC, Ethereum, Solana, BNB

+ 6 more

Bitcoin, Visa, Mastercard, Skrill, Neteller, Paysafecard

+ 8 more

Cashout Speed 0-30 minutes 0-15 minutes 0-3 days
No ID Cashouts
Visit Website bitz.io crypto-games.io neospin.com
Billyonaire: image of winning
Billyonaire - Features Analyzer
Billyonaire offers 6 out of 32 most popular online slot features
Autoplay
Bonus Game
Free Spins
Wild
Scatter
Multipliers
In-Game Jackpot
Progressive Jackpot
Buy Bonus
Megaways
Gamble Feature
Cascading Reels
Colossal Symbols
Adjustable Paylines
Pays Both Ways
Respin
Expanding Reels
Expanding Wilds
Expanding Symbols
Sticky Wilds
Random Wilds
Multiplier Wild
Walking Wilds
Multiplier Free Spins
Increasing Multipliers
Infinity Reels
Nudging Reels
Cluster Pays
Scatter Pays
Mystery Symbol
Hold Feature
Split Symbols
Billyonaire In Comparison With Other Slots
Billyonaire
Producer Amatic Fantasma Yggdrasil
RTP 96.33% 96.51% 96.0%
Volatility Medium High High
Max Win x1,000 x9,500 x10,000
Released Year 2017 2020 2023
Paylines 40 225 243
Free Spins 7 10-15 10-17
Buy Free Spins x100-x666
Multipliers x2-50 x2-infinity
Wild Symbol
Scatter
Other Features

Autoplay, Gamble Feature, Custom Paylines

Autoplay, Cascading Reels, Win Both Ways

Autoplay, Cascading Reels, Colossal Symbols, Free Spins Multipliers, Increasing Multipliers

Comparison Table of All Amatic Slots (176)
# Slot Name RTP % Volatility Max Win Play For Free
31.  Lucky Joker 10 Extr… 97.12 % Medium-high x7,500 Demo Play
32.  Hot Choice Deluxe 97.12 % Medium N/A Demo Play
33.  Lucky Joker Xmas 97.12 % High x7,500 Demo Play
34.  Triple Wild 97.12 % Low x300 Demo Play
35.  Bells on Fire Rombo 97.12 % Medium N/A Demo Play
36.  Cash and Crab 97.11 % Medium N/A Demo Play
37.  All Ways Hottest Fr… 97.11 % Medium x1,300 Demo Play
38.  Wild Hearts 97.11 % Medium x1,000 Demo Play
39.  All Ways Candy 97.11 % Medium N/A Demo Play
40.  Harle Queen 97.1 % Medium x1,000 Demo Play
41.  Mega Shark 97.1 % Medium-high N/A Demo Play
42.  Book of Pharao 97.1 % High x5,000 Demo Play
43.  Pharaohs Gold 20 97.1 % Medium x1,000 Demo Play
44.  Casanova Ladies 97.1 % Medium N/A Demo Play
45.  Sun Goddess II 97.09 % Medium x1,000 Demo Play
Comparison Table of All Amatic Casinos (7)
#Casino Bonus Program Deposit Visit
1.  BitzIO United States flag 100% up to 3000$/€ Bitcoin, USDT, USDC, Ethereum

+ 7 more

Visit Casino
2.  CryptoGames United States flag 100% up to 10000$/€ Bitcoin, USDT, USDC, Ethereum

+ 8 more

Visit Casino
3.  Neospin United States flag 100% up to 1000$/€ Bitcoin, Visa, Mastercard, Skrill

+ 10 more

Visit Casino
4.  JackBit United States flag Cashback up to 20% Bitcoin, USDT, USDC, Ethereum

+ 9 more

Visit Casino
5.  RakeBit United States flag Cashback up to 25% Bitcoin, USDT, USDC, Ethereum

+ 11 more

Visit Casino
6.  Bspin United States flag 100% up to 400$/€ Bitcoin, USDT, USDC, Ethereum

+ 9 more

Visit Casino
7.  Mbit United States flag 100% up to 70000$/€ Bitcoin, USDT, Ethereum, Ripple

+ 5 more

Visit Casino

This Page Was Last Updated: Dec. 11, 2025